Surface Pro — Peelable Protection Film for Asbestos Removal & Strip-Out
Surface Pro — spray-on protection for asbestos removal and strip-out
A peelable natural-latex film for floors, walls and retained surfaces inside the work area. It goes on pink so you can see coverage, dries clear, catches dust and debris where it lands, and peels away in sheets with the waste. Less polythene, less tape, faster clean-down.

Where Surface Pro is used
Inside the removal enclosure
Sprayed over floors, retained walls and fixed surfaces before removal starts, so fibres and debris that fall during the work stick to the film instead of settling into concrete pores, tape laps and joints. It replaces the polythene and tape that would normally protect those surfaces.
Faster clean-down
Debris sits on a smooth, continuous film, not in the substrate, which makes fine cleaning before clearance quicker. When the job is finished, the film rolls up with the dirt inside it and is bagged as asbestos waste.
Strip-out and soft demolition
On ordinary refurbishment and demolition work, a sprayed coat over floors and retained surfaces holds dust where it lands, so it is not kicked back into the air or tracked through the building.
Protecting finished surfaces
Tiled floors, shower trays, worktops, kitchen units, factory floors and plant, protected against grinder dust, plaster, paint and light foot traffic. For small areas and fixtures, use Surface Pro Brush.
Polythene-covered floors become very slippery when wet. A bonded film does not move underfoot and has no edges to lift or tape to leave behind.
Applying it to asbestos-containing materials
Surface Pro is mainly used on the surfaces around the asbestos, not on the asbestos itself. If your risk assessment calls for a temporary film directly over a sound, intact asbestos-containing surface, apply it with Surface Pro Brush or another low-pressure method. HSE guidance favours low-pressure application on asbestos materials. Do not use high-pressure airless spray directly on asbestos-containing materials.
Damaged or friable materials, including pipe lagging, sprayed asbestos coatings and most asbestos insulating board, need an HSE-licensed contractor. For asbestos that is staying in the building permanently, use Asbestos Shield.
How to apply Surface Pro
- Start from the survey and the plan of workConfirm the type, condition and extent of any asbestos from a current management or refurbishment and demolition survey, and decide the category of work. Prepare the risk assessment and plan of work, with operatives trained for that category.
- Prepare the surfaceSubstrate and air must be above 5°C during application and drying. Remove loose material and standing water using methods allowed by your plan of work. Mask anything you don't want coated.
- Patch testApply a test patch and peel it after 3 to 7 days to confirm it releases cleanly from that substrate.
- ApplyOn non-asbestos surfaces, use an airless sprayer at 100–150 bar with a 0.015–0.019" tip, with the sprayer filters removed (latex can congeal in them). Do not dilute. On asbestos-containing surfaces, brush or low-pressure only. Finish to a clean edge so the film peels in one piece.
- Check thicknessMinimum 0.5 kg/m² (about 500 microns); up to 1 kg/m² where the surface will take foot traffic. Check with a wet-film gauge, roughly one reading every 5 m².
- Dry, work, peelIt dries in 3–6 hours at 15°C and protects for up to 4 months. When the work is done, peel the film in sheets, bag it, and dispose of it as asbestos waste where it has been in contact with asbestos. Clean equipment with AW-1 cleaner, then rinse with water.
Technical data
| Property | Detail |
|---|---|
| Product type | Peelable temporary protection film |
| Base | Natural latex, water-based, solvent-free |
| Colour | Pink when applied, dries clear |
| Application | Airless spray on non-asbestos surfaces; brush or low-pressure on asbestos-containing surfaces |
| Coverage | Minimum 0.5 kg/m² — a 20 kg tub covers up to 40 m² |
| Drying time | 3–6 hours at 15°C |
| Protection period | Up to 4 months, then peel |
| Elongation | 800% (EN 12311) |
| Minimum temperature | Above 5°C (substrate and air) |
| Use | Internal only — not UV stable |
| Pack | 20 kg tub (spray); 4 kg tub (Brush) |
Always work to the latest Technical Data Sheet. Not a waterproofing or tanking membrane.
Priced per project
Surface Pro 20 kg is quoted per project, depending on area, substrate and access. Send us the area, the surfaces and your start date and we'll come back with a price.
Get a project price Call 01223 208174Frequently asked questions
A solvent-free, peelable natural-latex film. On asbestos removal and strip-out works it is sprayed over floors, walls and retained surfaces in the work area so dust and debris land on the film rather than in the substrate. When the work is done, it peels away in sheets and is bagged with the waste.
That depends on the work, not the product. Awareness training (UKATA Category A) is not sufficient for working directly on asbestos-containing materials. Non-licensed work, including sealing or encapsulating asbestos that is in good condition, needs non-licensed work training (UKATA Category B or equivalent), a written risk assessment and plan of work, and suitable RPE and PPE. Licensable work must be carried out by an HSE-licensed contractor.
Up to 4 months, then it peels away cleanly. Patch test first and peel after 3 to 7 days to confirm it releases from that substrate.
Yes, wherever it has been in contact with asbestos. Bag it and dispose of it as asbestos waste under your plan of work. The saving is in the polythene, tape and labour you no longer need.
Not with high-pressure airless. Airless spray is for the non-asbestos surfaces around the work. Where your risk assessment calls for a film directly over sound asbestos-containing material, use Surface Pro Brush or a low-pressure method.
No. It is internal only and not UV stable. For asbestos cement roofs and cladding that are staying in place, use Asbestos Shield.
Related
Last updated: November 2026