
Amianto
Asbestos coatings: seal it in place, or protect the job while it comes out
Asbestos Shield (formerly Soteria) is a permanent encapsulation coating that seals sound asbestos-containing material in place behind a durable finish. Surface Pro is a peelable protection film for the removal or strip-out job: sprayed over floors, walls and retained surfaces in the work area, it catches dust and debris and peels away with the waste. Which you need depends on one question: is the asbestos staying, or going?
Remove it or manage it — what is the actual choice?
Finding asbestos-containing materials in a building triggers an expensive decision, and the instinct is usually to get rid of it. That instinct is not always right. The hazard comes from fibres becoming airborne and being inhaled. Material that is intact, in good condition and not going to be disturbed is not releasing fibres. Removing it means breaking it, which is exactly what releases fibres, and is why higher-risk removal is done by licensed contractors inside controlled enclosures.
So the two options are not "safe" and "unsafe". They are two management routes with different risks, costs and consequences. Removal takes the material out of the building and ends the monitoring obligation. Encapsulation leaves it in place, sealed behind a coating, and keeps it on the asbestos register with an ongoing inspection duty.
Removal remains the right call where the material is already damaged or friable, where refurbishment or demolition will disturb it whatever is coated over it, and where the building's future use makes leaving it in place untenable.
What does the regulatory framework require?
Work involving asbestos-containing materials in the UK is governed by the Control of Asbestos Regulations 2012. We are a manufacturer, not an asbestos consultancy, so this is not legal advice and is no substitute for a survey, a competent surveyor or your duty holder's own assessment.
HSE lists encapsulating or sealing in asbestos that is in good condition as an example of non-licensed work. Non-licensed does not mean untrained: awareness training (UKATA Category A) is not enough for anyone working directly on asbestos-containing materials. Operatives need non-licensed work training (UKATA Category B or equivalent), and the work needs a written risk assessment and plan of work, suitable RPE and PPE, and a segregated work area. Damaged or friable materials, including pipe lagging, sprayed asbestos coatings and most asbestos insulating board, need an HSE-licensed contractor. Decide the category of work from the survey and HSE's guidance.
Three obligations survive any coating. Waste that has been in contact with asbestos, including peeled film, is asbestos waste and must be disposed of under the proper consignment procedures. Encapsulated material stays on the asbestos register and remains subject to periodic inspection. And the starting point is always a current asbestos management or refurbishment and demolition survey — the coating decision is made from the survey, not instead of it.
Which coating does which job?
Asbestos Shield (10 kg) — permanent encapsulation
- Elastic, crack-bridging coating, elongation over 200%
- Seals sound asbestos-containing materials in place
- Weather resistant — internal or external use
- Can be left exposed as the finished surface
- Spray applied for even coverage
For asbestos cement roofing and cladding sheets, external render containing asbestos, and painted asbestos surfaces that need an upgraded finish — where a survey supports leaving the material in place.
Surface Pro (20 kg) — protection during removal and strip-out
- Peelable natural-latex film; solvent-free, water-based
- Goes on pink, dries clear — easy to see coverage
- Airless spray on the non-asbestos surfaces around the work; brush (Surface Pro Brush) or low-pressure only on asbestos-containing surfaces
- Protects for up to 4 months, then peels in sheets with no residue
- Internal use only
- Priced per project — enquiry only
For floors, retained walls, fixtures and finished surfaces inside the work area, so debris lands on the film rather than in the substrate. Replaces polythene sheeting and tape on those surfaces.
Get a Surface Pro project price View the asbestos range
How each coating is applied
Asbestos Shield. Survey and record the material, and confirm from the survey that it is suitable for encapsulation. Prepare access without abrading or disturbing the material — this is where an encapsulation job turns into a removal job if it is done carelessly. Apply in even passes to the specified thickness, using low-pressure methods where possible in line with HSE guidance. Then inspect, document, and add the encapsulated material to the management plan with a re-inspection date. Because it is elastic and crack-bridging, it moves with roof sheets and cladding rather than cracking off them.
Surface Pro. Work to the risk assessment and plan of work, with operatives trained for the category of work. Patch test and peel after 3–7 days to check release. Spray the non-asbestos surfaces in the work area at a minimum of 0.5 kg/m² (up to 1 kg/m² where it will take foot traffic); on asbestos-containing surfaces use brush or low-pressure only. Let it dry (3–6 hours at 15°C), carry out the works, then peel the film in sheets within 4 months, bag it and dispose of it as asbestos waste.
Encapsulation or removal: how they compare
Costs vary hugely with the material, access and programme, so get quotes from your surveyor and contractors. The table compares the two routes, not prices.
| Factor | Encapsulation (Asbestos Shield) | Removal |
|---|---|---|
| Condition of material | Good condition, intact | Any condition — required for friable or damaged material |
| Who does it | Non-licensed work for sound material, by trained operatives (Category B) | HSE-licensed contractor for licensable materials; some lower-risk removal is non-licensed or notifiable non-licensed |
| Disruption | Usually low — work area segregated | Higher — enclosure, controlled access and clearance for licensed work |
| Asbestos removed from site | No — stays on the register | Yes |
| Long-term monitoring | Yes — periodic re-inspection | No — material no longer present |
Encapsulation saves money only where the material is sound and can stay. A coating over material that is about to be demolished buys nothing.
Where is it used?
Asbestos Shield goes where asbestos and occupation overlap: industrial and commercial roofing where asbestos cement sheets are still sound, schools and estates portfolios working through a management plan, healthcare estates, housing associations and landlords.
Surface Pro goes on the removal and strip-out job itself: floors and retained walls inside enclosures, transit routes, fixtures and finished surfaces that have to survive the works, and soft strip in buildings where a solvent-free, low-odour product matters.
See it on site
360° site tours Application videos
Further reading: asbestos encapsulation — when sealing beats removal · encapsulating asbestos: a safer alternative to removal · containing asbestos during removal with a peelable coating · less plastic in the skip · the full Surface Pro guide.
Frequently asked questions
What is the difference between Asbestos Shield and Surface Pro?
Asbestos Shield is a permanent encapsulation coating for sound asbestos-containing material that is staying in place, inside or out. Surface Pro is a temporary, peelable protection film for internal use, applied to the surfaces around removal or strip-out works and peeled away with the waste.
Is encapsulation always allowed?
No. It is appropriate only where the material is sound and will not be disturbed. Damaged or friable material normally needs licensed removal. Start from a current survey and your duty holder's assessment.
What training do operatives need?
Awareness training (UKATA Category A) is not enough for working directly on asbestos-containing materials. Non-licensed work, such as encapsulating sound material, needs non-licensed work training (UKATA Category B or equivalent), a written risk assessment and plan of work, and suitable RPE and PPE. Licensable work needs an HSE-licensed contractor.
How long does Surface Pro stay on?
Up to 4 months, then it peels away in sheets with no residue. Peeled film that has been in contact with asbestos is asbestos waste.
Can Surface Pro be sprayed straight onto asbestos?
Not with high-pressure airless spray. Airless is for the non-asbestos surfaces around the work. Where your risk assessment calls for a film directly over sound asbestos-containing material, use Surface Pro Brush or another low-pressure method.
Can Surface Pro be used outside?
No. It is internal only and not UV stable. For external asbestos cement roofing and cladding that is staying in place, use Asbestos Shield.
How do we buy Surface Pro 20 kg?
By enquiry — it is priced per project. Use the enquiry form with the area, surfaces and start date.
Two ways to work with us on an asbestos project
Supply. Buy Asbestos Shield from the store and apply it with your own suitably trained operatives, working to your risk assessment and plan of work. Surface Pro 20 kg is priced per project.
Supply and install. Send us the survey, the material type, the area and the programme, and we will come back with a proposed approach and a price.
Asbestos project enquiry Talk to the technical teamLast updated: November 2026
Shop Asbestos Encapsulation Products
-
Ejemplo de nombre del producto
Precio habitual $19.99 USDPrecio habitualPrecio de oferta $19.99 USD -
Ejemplo de nombre del producto
Precio habitual $19.99 USDPrecio habitualPrecio de oferta $19.99 USD -
Ejemplo de nombre del producto
Precio habitual $19.99 USDPrecio habitualPrecio de oferta $19.99 USD -
Ejemplo de nombre del producto
Precio habitual $19.99 USDPrecio habitualPrecio de oferta $19.99 USD