Surface Pro 20kg - Spray Applied Asbestos Encapsulation Membrane
Surface Pro 20kg - Spray Applied Asbestos Encapsulation Membrane
Priced per project. Tell us the substrate, area and access and we will come back with a quotation.
Surface Pro is a spray-applied, peelable film that protects floors, walls and retained surfaces during asbestos removal and internal strip-out. It goes on pink so you can see your coverage, dries to a clear, flexible skin that catches dust and debris where it lands, and peels away in sheets when the job is done — with no residue left on the surface underneath.
It is made from a biodegradable natural polymer, so it replaces the rolls of polythene sheeting and taped-down protection boards that normally end up in the skip.
Where Surface Pro is used
- Inside asbestos removal enclosures — sprayed over floors, retained walls and fixed surfaces in the work area so fibres and debris that fall during removal stick to the film rather than settling into the substrate, making clean-down quicker.
- Dust control on internal strip-out and soft demolition — on ordinary refurbishment and demolition work, a sprayed coat over floors and retained surfaces holds dust and debris where it lands, so it isn't kicked back into the air or tracked through the building. When the work is done, the film rolls up with the dirt inside it.
- Protecting finished surfaces on site — tiled floors, shower trays, worktops, kitchen units, factory floors and plant, against grinder dust, grit, plaster, paint and light foot traffic.
Surface Pro works on porous and non-porous substrates, including internal brickwork and concrete. Airless spraying is for non-asbestos surfaces. Where your risk assessment calls for a temporary film directly over sound asbestos-containing material, use Surface Pro Brush or another low-pressure method — HSE guidance favours low-pressure application on asbestos materials. For asbestos that is staying in place permanently, use Asbestos Shield.
Less plastic, less waste to landfill
Conventional temporary protection means polythene sheeting, tape and boards — single-use plastic that is ripped up and binned at the end of the job. Surface Pro replaces it with one sprayed coat:
- Biodegradable film made from natural polymers, not oil-based plastic sheet.
- No tape, no laps, no boards — nothing to cut, overlap or fix down, nothing to lift underfoot, and nothing left behind once it is peeled.
- Recyclable tubs — let any residue dry, peel it out and the tub can be recycled or reused.
Important: any film that has been in contact with asbestos must be bagged and disposed of as asbestos waste, in line with your plan of work. The waste savings apply to the plastic sheeting and protection you no longer need.
Performance
- 800% elongation (EN 12311) and high tear resistance — it stretches with movement instead of splitting.
- Dries in 3–6 hours at 15°C.
- Protects for up to 4 months, then peels away cleanly.
- Coverage: minimum 0.5 kg/m² (about 500 microns), so a 20 kg tub covers up to 40 m². Use up to 1 kg/m² where the surface will take foot traffic.
Applying Surface Pro
- On non-asbestos surfaces, apply with an airless sprayer at 100–150 bar with a 0.015–0.019" tip. Remove the sprayer filters first — latex can congeal in them.
- Do not use high-pressure airless spray directly on asbestos-containing materials. Use brush or low-pressure application there, as your risk assessment allows.
- Substrate and air must be above 5°C during application and drying. Remove loose material and standing water first, using methods your plan of work allows.
- Do not dilute. Mask anything you don't want coated and finish to a clean edge so the film peels in one piece.
- Check thickness with a wet film gauge, roughly one reading every 5 m².
- Clean equipment with AW-1 cleaner, then rinse with water.
Limitations
- Internal use only. Surface Pro is not UV stable — keep it out of direct sunlight and do not use it on external roofs, cladding or guttering.
- Not a waterproofing or tanking membrane, and not a permanent asbestos encapsulant.
- Patch test the substrate first and peel after 3–7 days to confirm it releases cleanly.
Work involving asbestos must be planned under the Control of Asbestos Regulations 2012, based on your asbestos survey. Awareness training (UKATA Category A) is not enough for working on asbestos-containing materials: non-licensed work needs non-licensed work training (UKATA Category B or equivalent), and licensable work must be done by an HSE-licensed contractor.
Priced per project
Surface Pro is supplied in 20 kg tubs and quoted per project, depending on area, substrate and access. Send us an enquiry or call our technical team on 01223 208174.
- Data Sheets
Shipping & returns summary
Shipping & returns summary
We, at Intelligent Membranes, would like you to be 100% satisfied with your purchase and our service. In the unfortunate event of any item being unsuitable or wrong, please read the following for advice on returning goods to us.

Discover which Intelligent Membranes product best fits your build with our handy comparison table.